and/or windrow mixing.
field.

The method used will be determined in the

Encrypment of the contaminated material will be at the

Cactus Crater

site withne
the mound adjusted to accommodate the

volume of contaminated material generated by the cleanup operations.
Consideration has been given to the use of LaCrosse Crater in addition

to Cactus Crater but is not recommended since more time, materials and
tet

costs will be incurred under this scheme,
a.

See Appendix A.

Recommended sequence of contaminated material placement is

as follows:
(1)
of crater.

Dump large pieces of radioactive material into bottom
Material should be well dispersed to preclude subsequent

material from "hang-up",
prevent voids.

Scrap metal should be cut up into pieces to

The dispersion should be monitored to assure optimum

placement of concrete slurry,

Place concrete slurry with concrete pump and barge as shown

on the drawings.

:

Ee. PAs

aber et

iw
rngtt Awd
tt : yet.
Re
RRR
Poh
Bg
or
+ AE

wes

Re

SSAA

ao hee CPW,

a

ee, We
y

ee
cay ya
eReaeauoeReBRIER

mt Fg)

:

*
en

tear

esi

¥

'
Pene
aSee
geen se, Piri

(approximate elevation +5,0).

Be
Fy eh

the tidal level

Concrete slurry shall be placed up to the top of

&

(2)

Select target paragraph3