ee ee FCZ SUBJECT: 28 Nov 77 Chairman's Report - Conference on Runit Cleanup, 4-5 October 1977 m. CJTG must provide adequate priority for resources; logistics, transportation and personnel, to ensure smooth operational continuity. Priority should be second to Lojwa and Runit construction and equal to other radiological cleanup operations. Work schedules and immediate priorities must be set by CJTG in coordination with ERSP and other organizations concerned. The Runit characterization efforts outlined in a through £ above should be considered as a part of the beginning cleanup operation and given appropriate priority. Target date for completion of data acquisition resulting from a through f above is 15 January 1978. n. Stockpiling of contaminated debris and soil from other islands may have to be adjusted from planned locations to avoid interference with characterization of the FIG/QUINCE area. Contaminated soil must be separated into two stockpiles: one stockpile for soil excised from areas contaminated to levels greater than 400 pCi/g; the second stockpile of soil excised from areas of lesser contamination. 1 Encl as CHARLES J. TREAT COL Ord C Chairman -