U.S. ARMY ENGINEER DIVISION, PACIFIC OCEAN
CORPS OF

ENGINEERS

PROJECT TITLE __Enewetak Atoll Cleanup
SH NOL oF LL sHs
LOCATION
SECTION
;
DRAWING (S) NO.
comPUTED By _KVK
oate10/14/7b ecKken By
DATE
DESIGN ANALYSIS
Design Storm - assume 10 year storm
*

Hp

=~

10!

T

=

12 seconds

Stillwater elev
Se

+ SA

=

ap |.

|

he

!
|
t
1

Se +S

+Sw+Sap

vee

=

SSwoty

=

|

i

'

;

=

7.6', wind setup ignored

_

j

'

i

'

i

\

|

|

}

.

tbe

‘

re LD me tn (mer emer pe pomp oe pot pcp

{

1

7.6'

i

|

‘

t

{

‘

(

}

'

Tidal Data
Range

'

Mean

2.7'

Denssed spring

sR

3.9!

'

ss

M. Tide Level:
2.6!

fo.

‘

Paygrades ba
'

\

{

'

oe

i

po

4

1 Jai! dd

|

t

:

3.9!

0.50
0,00

&
a

be bemfa s

ped et Fk me,

betesoch pheas Lectheciheied dacbean ch alec serbiahthe:

“Depth of water= 7.6 -2 ="5.6"oT fora aprmatpee gts
Reef. surface approx + 2'

'

Hypo = 5.64 12528 = 4,3"
Use 4' design wave height

;

"|

ae

i

i

|

Reef with zero slope extends about 1400' seaward of crater, therefore
1.28 used is in lieu of SPM Fig. 7-2 or 7-3.
+

1

awards cwh

'

e date:wf

t

_

atom

bo

So

to

asbht

ob

yay.

.

.

“ pope

,
‘ae
a

fs cat witha we

-

row “ 4

i “

|.

i

a}:

-

j wiifue, ben: 4 wh.detahi jako ne

oo

.
porrot et

|
j
c 4 esse
Yapa
yo
prope

-4-

ee me
}

J--

-

.

|

‘4

aowd.

‘

‘

t.

POD Form 115
1 Jul 70

ae cn TT een “oO ‘ “athe

'

.

.

omen eg un Ne ee were tt “pom meres a aoe rere ere Ty
~~

.

.

~~

.

0

a,

.

.

Ln)

oan

rr ee

.

_

\

.

:

ae fon .

eyes

4

.

* mie vere nero

at

oe t.

LE

phate

.

Select target paragraph3