6,
provide plans and details for a brackish water system for the
laundry,
7.
provide design for
the electrical distribution system and
flood lighting,
8.
provide equipment list for concrete slurry placement,
9.
provide design of ramp at north end of Runit for off loading
dump trucks,
C.
pescription of Work,
1.
Encrypment of Contaminated Material.
The volume of contaminated
material will vary from70,000 cy to 200,000cy._ Drawings have been
prepared to show the configuration to contain this variable volume.
The concrete slurry mix which is placed under water may require from
me
2 - 8 bags of cement per cubic yard.
aad
The amount of cement required
will be determined by Waterways Experiment Station (WES).
The
concrete mix of the contaminated material placed above water will be
ee
approximately 2 bags of cement per cubic yard.
This mix will be
compacted by a vibrator roller to obtain a stable compact mass,
Placement of the mix above water may be by concrete pump, transit mix,