TABLE 5-!:

SUMMARY OF ESTIMATED COSTS ($000)

Case

Program Activity
Field Construction _
Base Camp Rehabilitation
_ , Radiological Cleanup

.

2

3

4

4,405]

4,488

4,488;

4,488

1,502]

2,089}

3,384]

7,708

14,121

Technical Support

97

97

97

97

Logistical Support

6,933]

10,193

13,992

23, 318

12,566]

15; 326}

19, 966

33,245

i*Physical
Cleanup
y

‘Maintenance and Operations
Including Equipment

Total Program

Qo,

fos

2,085}

:

6, 343

25, 503 35,577 48, 396 81, 612

The above estimated costs are based on the assumption that operations
will begin late in 1975. Disposal costs are shown separately and are
additive to these totals.

*

Level 2 for Cases 2, 3, and 4; Level 3 for Case 5.

Select target paragraph3