:
TABLE 5-!:
SUMMARY OF ESTIMATED COSTS ($000)
Case
Program Activity
Field Construction _
Base Camp Rehabilitation
_ , Radiological Cleanup
.
2
3
4
4,405]
4,488
4,488;
4,488
1,502]
2,089}
3,384]
7,708
14,121
Technical Support
97
97
97
97
Logistical Support
6,933]
10,193
13,992
23, 318
12,566]
15; 326}
19, 966
33,245
i*Physical
Cleanup
y
‘Maintenance and Operations
Including Equipment
Total Program
Qo,
fos
2,085}
:
6, 343
25, 503 35,577 48, 396 81, 612
The above estimated costs are based on the assumption that operations
will begin late in 1975. Disposal costs are shown separately and are
additive to these totals.
*
Level 2 for Cases 2, 3, and 4; Level 3 for Case 5.