¢.
:

a

on the job, dosages equipment operators received, effectiveness of the
decontamination, time required to camplete the decontamination,
photographs, and any other pertinent facts relating to the

problem.

Upon completion of this report, a copy will be submitted

by the Assistant Manager, Office of Test Operations to the Division
of Biology and Medicine, IMA, Washington, D.C.

Work performed on

all decontamination projects will be coordinated with CT¢ 7.1,
cru-6.
7.

NON-TEST PERIOD OPERATIONAL GUIDE

a.

Radiation Exnosure
The cumulative exposure to TG 7.5 personnel during non-test
periods will be the same as currently authorized for the
operational period.

Every effort should be made to keep person-~

nel exposure to a minimum.
b.

Radiation Contamination
‘The 2ontamination limits as prescribed in paragraph 5b also apply

during non-test periods.

c. Entry into Contaminated Areas
(1)

°

Entry of all personnel into contaminated areas will be controlled by the HRN Rad-Safety Organization.
~l1h-

Gate,
COPIED/DOE
LANL RC
en ee eg

-

=

7

Tpapen

Ie

Select target paragraph3