fen

&

_

G7
h.

Removal of Radioactive Material
During test periods no radioactive material, except material
shipped by fly-a-way aircraft, will be removed from EPG without

prior written approval of CTU-6.

All other radioactive materials

which are removed from EPG will be packaged, monitored, labeled,
and loaded so as to satisfy the Interstate Commerce Commission
and MATS regulations for transporting radioactive material.
1.

Emergency Plan
An emergency plan will be prepared by the Support Contractor

Rad-Safety Officer that will set forth in detail those procedures dealing with situations that require TG 7.5 personnel
to remain indoors and those which require people to be evacuated.

Emergency programs will be coordinated with CTG 7.1, TU-6.
6.

DOCUMENTING DECONTAMINATION
The Support Contractor will, at any time that it becomes necessary

to decontaminate an island or area that has become contaminated as
& result of radioactive fallout, submit a full report in quadruplicate
to the CTG 7.5.

This report will include such data as:

map of area

showing radiation intensities, radiation levels at specific locations
prior to decontamination, radiation levels upon completion, effect of
character of terrain on radiation intensities, type of equipment used

~13-

COPIED/DOE
LANL RC

16

Select target paragraph3