23 Oct. 59, J-3 Report: Here is an entry on the report entitled "Report of the Study Group on Organization. for Future Testing Operations," 20 August 59, published by the military, and documented in several other sets of my notes to a great degree. Here it is noted that Duncan Curry is studying the impact of this report in conjunction with Sewell of Livermore and Fowler of Sandia to determine what must be done with such a report. It is stated "The report proposes additional steps in the wrong direction; more task force control, even in the planning stages, without any BY increased capability for plans and operations; and the creation of several scientific tasks groups without any adequate machinery for resolving their conflicts in requirements and operations. The report was prepared without as€ertaining the views of the laboratories or of ALO. DMA and DOD are reported to be working on a new agreement refered to in the report. Frank DiLuzio of ALO says that this agreement will be referred to ALO for comment before being consummated; and that ALO will obtain Laboratory advise before commenting." 26 Oct. 59 memo (KPS 59-144) from Knapp documents modification of Succotash which LCT now includes planning for only two projects as follows: POET BUTLER Ready Date -~ 15 Feb. 60 = C. : Ready Date ~- 15 May 60 Dates are based on manpower allocation in early November 59. Jocuments show planning along these lines continued through November. *‘lanning and preparations for POET readiness continued through 22 Jan. 60 as ocuments show, still based on a 15 Feb. ready date. }

Select target paragraph3