‘hrough out 1959, long drawn-out negotiations were conducted concerning
1e possible transfer of JI from the Air Force to the Army for the
fike-Zeus Program. Plans for enlargement of Johnston Island by approximately
3 acres by means of fill dredged from the ocean bottom were made and a
ontract was awarded 9 July 1959 with completion scheduled for 1 February
960. Construction personnel and equipment arrived in August and September.
4
. Causeway was built into the lagoon to facilitate obtaining the fill.
bur
9 July -~ 359
Ce
‘N
At meeting of Executive Council of the
French Community, France announces intention
CR
to conduct atom tests in Sahara.
$7
A 10 July Memo For Record within the 4950th
on the status of the EPG notes
the deliberations of the high level committe
e including General Starbird on
.
the recommendation to drop the EPGtoa
minimum maintenance status and
their agreement ''In principat",
BY
!
a
Further itis noted that the PMR activities
involving facilities at the EPG will not be
able to have the support of the
helicopters based on the planned phase down.
Wi,
A USGS Trace Elements Memorandum Report Number 1036
(TEM-1036) entitled "Geology of the Marble Exploration Hole 4,
NTS, Nye County, Nevada" by F.A. McKeown and V.R. Wilmarth.
This USGS report made to Mr. Reeves of ALOO, I mentioned only because
it documents the drilling of a 1200 foot hole in the north central part of the
Tippipah Spring quadrangle at the NTS. The drilling took place ictween
July 13 and August30, 1959.