John A, Derry

D.

- 6-

July 12, 1950

Instrumentation seports
During the month it was learned that the Naval Bureau of Aeronauties is not distributing their contractor progress reports

to the AEC,

This was called to the attention of the Yivision

of Public and Technical Information Service who will make arrange-

ments to receive copies of these reports. An investigation disclosed that most of the AEC instrumentation personnel are not
aware of the Department of the Defense activities in radiation
instrumentation. Although some copies of their contractor progress reports are received by the Library Branch in lak Ridge and
appear in their abstracts, the Branch is considering routinely
distributing our own abstracts of all the military reports.

E.

Semi-Annual Report to Congress
Material concerning radiation instruments for the next semi-annual
report to Congress was ziven a final review by members of the Branch
and minor changes and revisions were suggested and incorporated.

Enclosures:

As described in IFabove

US DOE ARCHIVES
326 U.S. ATOMIC ENERGY
COMMISSION
RG

_D0E HISTORIAN (OB 17)

Collection
Box

_“/22

3363

Folder

_#*/4

DO€ ARCHIVES

Select target paragraph3