,

Effects on

Aircraft

and on aircraft comatomic explosions on‘aircraft inflight
gust and te mperature effects of the
ure,
press
with
d
erne
conc
was
ram
The primary mission of this prog
program.
blasts were carried on under this
operations in conjunction with the
air
to
ing
relat
cts
proje
d
alize
several speci
ponents on the ground. In addition,
over ten
ial Command and accounting for
al aircraft conducted by Air Mater
iment
exper
of
on
icati
modif
and
the operation
The major costs of this program were

one anda
drone activities accounted in excess of
million dollars. The Air Proving Ground
six
ial,
mater
and
ies
suppl
and
rs;
dolla
million dollors; labor, four million
am. Supplies and
the balance of the cost for this progr
and supplies
half million dollars for personnel costs

materials made up
and materials. Other equipment and

materials and supplies did not
in operation. The installation of these
nded
expe
as
ted
repor
were
and
on
aircraft during modificati
material were installed in the test
drone control equipment,
such items as special radio equipment,
capital equipment. This included
as
ted
repor
be
d
shoul
ally
logic
necessarily destroy their yalue and

g the.operation, three T-33's totaling
experimental type aircraft were lost durin
Six
es.
devic
ng
testi
und
al
iment
other exper
recording meters, directional and many
operation,
$78, 000.
$387,000 and three L-13's totaling

8.1. Test of Aircraft Airbome

s
8.2 Static Tests of Aircraft Panel

8.3 Radar Scope Photography

credited to the cost of the
nted to $19,500, which amount was
The salvage of the three L-13's amou

CHART OF ACCOUNTS
8.7.

Air Proving Ground Unit Training

eres
TPO aT or Te reer
eye

8.99

Common to Program

e

Select target paragraph3