COSTS OPERATION |GREENHOUSE JOINT TASK |FORCE THRE LONG GE DETECTION CAP ITAL OPERATING COSTS \A) IDE NO. (B) PAYROLL MIL CIV 39, 281 185,062} (C) SUPPLIES a ATERIALS 228,683 16, 670 ITAL 176,070 " (D) OTHER costs (€) - TOT, ER.COS +(C)+(D) 453,026 16,670 16,277} 152,726 169,003 42,352 11,243 53,745 807, 282 355 944 276 1,636,720 (F) BUILDINGS PAYROLL MIL ~ CtV MATERIAL DR CR