UNCLASSIFIED
@pTable L.1— (Continued)
No. of

‘

-

persons

Item

Time

, Project

(exclusive
of crew)

.

9
10

0730
0730

Aerial survey
Ground survey

2
2

1 helicopter
1 helicopter

ll

0800

Water survey

2

1 helivopter

0900

:
‘

,
"

transportation

Approx,

recovery

4,1, 4.2, 4.4,
§.1, 5.2, 8.1

3
2

1LCU,
2 DUKW’s,

a

4

1'4-ton truck,
2%/,-ton trucks,

and remarks

13

=—s-0900—ts«6=.8

2

14

0900s

6.2

3

15

0900

§.4b

16

1600

Water survey

with A frame

All islands
Y; other islands as
required
Lagoon

Y, Stations
412.01—4.2.24, 441,

§11.01-511.26,
§21.04—521.06,

1%%-ton truck

@

Destination

time, hr

K+i Day

12

:

Meansof

810.09—810.11

LCM
¥/-ton truck

a'4 . T, Station 630,04

LCM

24

Lagoon to recover

4

1 helicopter

8

A, 8, C, I, J, K, L,

2

1 helicopter

rafts

M, N, O, P, R, S,
T, U,V, W, ¥, Z,
BB, DD, EE, FF,
GG,JJ, KK,LL,
andMM

Lagoon

K + 2 Days
17
18
19
20

0780
0730
0800
0800

Aerial survey
Ground survey
Water survey
§.4b

2
2
2

1 helicopter
1 helicopter
1 helicopter

21

1600

Water survey

2

1 helicopter

£

‘

22

0800s

«5.3

2

1 helicopter

[.

Eeneet aor Ne MeeiN ere

ne tows

;

i

All islands
As required
Lagoon
Continues from
previous day
Lagoon

8

A, J, T, ¥, BB, LL,

After K + 2 Days

:

i

2
2
2

}

SNOLASSIFIED

103-104

wee ee ee

EE, and FF

PAL Wem EAMRTAT ERT sore etOPM orNCARALAMTG A to ae LAMASURO SAR,akAE SReeANatiEitetNTISRALIane IAAREAS 0BSIS

—

pe Cee ere ve,

IMOLASSIey
+

ele

OMAN OD

;

“SOT cercrenes.

Select target paragraph3