~

ee

.
C

irersht stirtoremcet

Providing circraft cs required by Opcrations.

(2)

Insure thet scheduled aircraft nest the operational requirenert
for special cquipier

(3)

Provice a adequate mmber of ground cremen and engineering
speciclist in order to insure the take-off schedule and tic
expefitious ground handling of all aircraft.

{4)
(5)
(6)

C

ce.

Assist weather cguipnont neintenance personnel in the mountinc
denounting of tho 3/31 racks.
m
Renfcr maxi 2 aid to other agoncies in the instellation of

special equipnent to be place? aboard certain WE-29,.

The DMlectrenics iin teninee Seetion will be responsitle

to
mis

ihe testing cna neintcnenes of the Neck 10 IFF, APQ-13

(3)

Insure thet 211 VHP sets ere ehzrnele? accorcing to freqioncies
fort
“th in “nncx "4",

the SCR 718 Fader sltinctcr, ant *FN, 2? Loren Set,

Maintain communication oquipnont in opcrational state at all
tincs.

a,

Weather Miirntenants:

sible fer:

{1)
(2)
(3)

C

» for WB.29 *docontarination.

(2)

(4)

Ratner |

Frovide a specislized deco eanstion crew, availatle upon csil

from the dccontrnination ce

Electronics:

(1)

©

‘The Aircraft Maintusance Section will be respcn-

(1)

S y

Neemwere:

&

(4)

The Wocther Maintencize Section will be rospox-

The ncintenence of installed woather cerupert and sequirad) Cage +

dsble supplics in unit circraft,

Maintein "3B" component of B/31 in stas2 of zcatincss on M-l CO}.
Insure that C1 og
Gqivipnent and siites ire servicont?s: on cll
schoculed aircraft,

adisgy B/31 racks on cesignvtes abroyvift art preeflichting sze
acccrdance with cxastit Gg Sorts, Uslocting wy31 rocks upon exiled
tion of cach missicn cficr aircraft has becn checked by deconton.
inaticn center as coordinator with Ficld Dirécta of Progran 7,2.

TSK E
£ LEMENTee L301
OPNS CALDER NO, 1-52

ie 4

ftw

t

<

BEST AVAILABLE COPY,

,
4

“

.

.

ay

.

a

t
’

.
12

.

ota

.

ts

a

oorbe
» 3% ve

Select target paragraph3