350

eer

“)

oy

At 0620, steaming from Kwa-

13 May at 1746 underway from

0620

14 May

NECTAR (E)

Source:

bearing 150° from shot;

USS Bairoko (CVE-115) Deck Log.

Kwajalein Atoll
Atoll

Philip

to Bikini

Bikini operating area with

25 April at 1853 underway for

jalein to Bikini, 40 nmi
(74 km) SE of Eneu

0625 set modified condition
Able; between 0652-0702 washdown gear on

At 0610, 34 nmi (63 km)

bearing 155° from shot

At 0605, 57 nmi (105 km)

4 May at 1555 underway with
Renshaw (DDE-499) from Bikini
to assigned operating area

0605

operational area off Bikini

0610

from shot

5 May

ing 100°

At 0620, 23 nmi (43 km) bear-

operating, but no new fallout received

At 0630, 43 nmi (80 km) bearing 124° from shot; from
0700-0710, washdown gear

YANKEE (B)

Epperson (DDE-719) in the

Steamed in the company of the

ational area off Bikini

26 April at 2024 underway

from Bikini Lagoon to oper-

from Bikini to Enewetak

use until 1845; steamed from

began; firehoses continued

tem; at 1800 a second fallout

after securing washdown sys-

At 0645, 38 nmi (70 km) bearing 1326 from shot; at
material condition Able set
when heavy fallout detected;
washdown system operated
0810-0931; firehoses used

26 Apr

0620

0630

area; 1 March at 0243 rendezvoused with Philip (DDE-498)

28 February at 2307 underway

from Bikini to operating

At Shot Time

UNION (B)

27 Mar

ROMEO (B)

0645

Preshot

Ship Location/Activit

1405 anchored in berth N-5, Bikini;

1206 anchored in berth N-3, Bikini; at
underway for Enewetak

From 0912-1045 Philip alongside to fuel;

At 1643 anchored in berth N-6, Bikini

1611 anchored in berth N-5, Bikini

1104 anchored in berth N-5, Bikini

buoy T-2, Bikini; 29 March washdown system
operated 0130-0215; reactivated at 0320

March at 0859 after shifting moored to

approximately 0900 launched two heliters for initial radiological survey;

carried on all day; 3 March arrived Bikini,
launched helicopter radsafe surveys

use of high-pressure hoses and scrubbing

March decontamination efforts started
gain after 0800 radiological monitoring;

Postshot

uri ng the CASTLE test series.

7 Apr

1 Mar

BRAVO (B)

Det.

Time
of

USS Bairoko (CVE-115) operational activities

KOON (B)

Date

Shot

Shot

Table 67.

Select target paragraph3