~

Tosti,

‘

7

r

~

BO SWhRG
ver

Senet

BySb.nterhy
~~ 9

ve

kei
Figure 52.
Operations:

Scrubbing Project 6.4 test aircraft, CASTLE.

Sets of panels of outdoor construction surfaces were

mounted on YAG-39 and ¥AG-40, which maneuvered through fallout patterns from Bikini shots, and on a stationary barge in the Enewetak
Lagoon to sample fallout from NECTAR.
significantly.

All surfaces were contaminated

Decontamination was performed at Parry, using such

procedures as high- and low-pressure hosing, scrubbing, and applica-

tion of washing compounds.
Shots:

BRAVO, ROMEO, UNION (Bikini); NECTAR (Enewetak).

Radiation Exposure Potential:

High for those on the YAGs and for the

personnel participating in decontamination procedures and experiments
at Parry.

Staffing:

Five were associated with this project, three civilians

(two from ACC, one from Corps of Engineers)
AFSWP and one from ACC).

and two military

Their exposures are given in Table 19.

posures for those involved from TG 7.3 are given in Table 59.
Project Report:

(one from

Reference 73.
196

Ex-

;

Select target paragraph3