Greenhouse to Stay -2- Au. t 18, 1977 2) Batteries, 124 each, 6 volt, 360 amp hr. shipped on 4 pallets plus 37 crated pails of electrolyte (also palletized). Shipping weights are batteries-6800 lbs, electrolyte-1900 lbs. This shipment will be leaving the east coast manufacturer by truck “August 22 bound for the H & N, Oakland Logistics Office with instructions for transshipment to H & N, Honolulu for inclusion on Islander voyage #97. 3) Towers, 3 each Rohn 70 ft, guyed, with anti-climb sections. and 4) Inverters, 3 each, 110 vde to 110 vac, 60 Hz, sinusoidal, 250 spare parts kit. This export-packaged shipment will be packed in 3 crates totaling 2700 lbs. It is expected to leave the midwest manufacturer ~August 19 bound for H & N, Oakland. watt. To be shipped from manufacturer on August 22 to H & N, Oak- land, 5) The shipment will consist of 1 crate ~200 lbs. Miscellaneous items to be shipped from Enertech Corporation: (a) (b) (ec) Low-voltage disconnects, 8 each, 1 crate ~80 lbs. Lightning protection systems, 3 each, 120 1b. bundle of ground rods. Installation kit, shipped as 3 bundled poles and 2 crates, total weight ~300 lbs. and 600 lbs. each. This shipment will depart Norwich, Connecticut ~August 22 for H & N, Oakland. I will keep Jack Livingston informed by phone or TWX as further details become available on these shipments. We would also like to enlist your assistance in having the 5 reinforced concrete base piers (3) and guy anchors (9) for the wind generator towers prefabricated for us at Kwajalein. I am enclosing HS wl! There are also some supplies which might best be provided by Global or H & N to save our having to ship from the mainland. They are as follows: EX drawings for your information; and, if the prefabrication work can be arranged, we will forward some jigs to Kwajalein which will facilitate the construction of forms and insure the proper allignment of special hardware (also supplied by us) which will be cast into the concrete. 1) Shelving for the battery sets - We will need a total of 108 board feet (36 bd.ft. per installation) of lumber, preferably as 2 x 6 inch stock, but sufficient 2 x 4 stock to make shelving nominally 12 inches deep will suffice. . 2) Concrete or cinderblock supports for shelves = We will need 48 standard 8 x 8 x 16 inch cinderblocks. ? hha ‘