ae sttclvie? im the weuipeemst were ..o kerosene-driven refrigerz.ars wileh regrired special care for starting and operating, Since cach Detacheest 1s furnished six 120 Volt generators there weld’ be wo diffienity if each Detachment were given two electric refrigerators as replacements for the less practical kerosene units, 5- Concerning electronic that each Detachment obtain and work to them for at least two weeks prior ordex to eliminate ths flaws in each equipment, it is highly recomended with the e,uipment to be assigned to shipment of the equipment, in unit, including the test sets as well as the SCR 658 and allied equipment. This Detachment received equipment in need of repair, and two weeks of work were required to get all units into effective operation, 6 It is recommended that two power mits capable of putting out 220 volts for electric stove and electric reefer units be supplied each Detachment. -_~ Inclogure 2 is a recommended list of deletions and additions to the supplies for Majuro for future projects. It is further recommended that personnel requirements remain the same for future projects as for IVY. If two fully qualified Ground Electronic Technicians are assimed to each detachment, the officer in charge need not be a 3044. 2 Incis: 1. Roster of Personnal 2. Recommended Deletions and additions to Project JOHN W. DONAHUS Capt, USaFr Detachment Commander BEST AVAILABLE Copy