ae sttclvie? im the weuipeemst were ..o kerosene-driven
refrigerz.ars wileh regrired special care for starting and operating,
Since cach Detacheest 1s furnished six 120 Volt generators there
weld’ be wo diffienity if each Detachment were given two electric

refrigerators as replacements for the less practical kerosene units,
5- Concerning electronic
that each Detachment obtain and work
to them for at least two weeks prior
ordex to eliminate ths flaws in each

equipment, it is highly recomended
with the e,uipment to be assigned
to shipment of the equipment, in
unit, including the test sets as

well as the SCR 658 and allied equipment. This Detachment received

equipment in need of repair, and two weeks of work were required to

get all units into effective operation,
6

It is recommended that two power mits capable of putting

out 220 volts for electric stove and electric reefer units be supplied
each Detachment.

-_~

Inclogure 2 is a recommended list of deletions and additions to the
supplies for Majuro for future projects.
It is further recommended that personnel requirements remain the

same for future projects as for IVY.

If two fully qualified Ground

Electronic Technicians are assimed to each detachment, the officer in
charge need not be a 3044.

2 Incis:
1. Roster of Personnal
2. Recommended Deletions and
additions to Project

JOHN W. DONAHUS
Capt, USaFr
Detachment Commander

BEST AVAILABLE Copy

Select target paragraph3