” PRIVACY ACT TERIAL REMOVED AOR Project 2,_ (In Charge) and Bravo thru Uncle and Tare. (Monitor): Eee Recovered filg Project 13.4 < _ ,In Charge), Went to Station 1341 and recovered equipment, HAN « and + (Monitor) esses plus one TU~7 monitor ..... Completed circuit of Atoll orbiting near 4Of generator stations, Damage Survey, Program 15 and Project 13h weoee cancelled, TG 7.3 mission. 10. POKG - . TU-13 -, . and aeoe To Tare to end recovered records (iG4&G) and returned on Boat Miasion #11 (1348), TU-13 Tecovered documents. The following BRAVO Boat Missions were completed (Bk) according to the following priority 1. ICM 43 to Nan carrying 2 Project 13.4 men. 2 men Program 18 ani 1 monitor ani 1 Aan man (Barber(Project 13.2) and _ (Program 18) in charge). Recovered records and picked up tools and equipment, nl Cancelled. ICM 49 to Tare carrying 8 H&N men, 1 monitor, 4 TG 7.5 men and 2 Project 2.5a men, and . . in charge, Decontamination and Recovery of radio equipment ~ rehabilitation, hk. 100 638 to Tare and Able with 2 DUKW's (one with monorail), 5. UX 37 to lagoon with 4 Project 1.6 men {( 6, LCM 36 to lagoon with 3 Project 2,5a men and 2 HAN men | 7. ICM 38 to YCV as standby for shuttle, & Project 2,5a men ( in charge) and 3 Project 2.5b men (7 in charge). Packaged fallout samples, 8 with 3 Project 2.3 men, Recovered neutron detectors, covered fallout samples, LCM 43 to BAIROKO and DDB ih9 with 3 men from Project 2,3 / with Project 2.3 samples from Boat Mission No. 4, on DDE 49 with courier, 9. 10, in charge), ‘in’ charge) Recovered records. in charge). Re- in charge)» Packaged and shipped samples ICM 7 ~ Used as ahip passenger pickup for personnsl from ESTES and BATROKO via DDE hhg to Elmar, ICM 4k) - Used as aircraft passenger pickup for personnel from ESTES and BATROKO returned to Elmer via PHY, -2 Je crn yee suena