”

PRIVACY ACT TERIAL REMOVED

AOR

Project 2,_ (In Charge) and
Bravo thru Uncle and Tare.

(Monitor): Eee Recovered filg

Project 13.4 <
_ ,In Charge),
Went to Station 1341 and recovered equipment,
HAN «

and

+ (Monitor) esses

plus one TU~7 monitor ..... Completed circuit of Atoll

orbiting near 4Of generator stations,

Damage Survey,

Program 15 and Project 13h weoee cancelled,
TG 7.3 mission.
10.

POKG

-

.

TU-13

-,

. and

aeoe To Tare

to end recovered records (iG4&G) and returned on Boat Miasion #11 (1348), TU-13

Tecovered documents.

The following BRAVO Boat Missions were completed (Bk) according to the following priority

1.

ICM 43 to Nan carrying 2 Project 13.4 men. 2 men Program 18 ani 1 monitor ani 1
Aan man (Barber(Project 13.2) and
_ (Program 18) in charge). Recovered
records and picked up tools and equipment,

nl

Cancelled.

ICM 49 to Tare carrying 8 H&N men, 1 monitor, 4 TG 7.5 men and 2 Project 2.5a
men,
and .
. in charge, Decontamination and Recovery of radio
equipment ~ rehabilitation,

hk.

100 638 to Tare and Able with 2 DUKW's (one with monorail),

5.

UX 37 to lagoon with 4 Project 1.6 men {(

6,

LCM 36 to lagoon with 3 Project 2,5a men and 2 HAN men |

7.

ICM 38 to YCV as standby for shuttle, & Project 2,5a men (
in charge)
and 3 Project 2.5b men (7
in charge). Packaged fallout samples,

8

with 3 Project 2.3 men,

Recovered neutron detectors,

covered fallout samples,

LCM 43 to BAIROKO and DDB ih9 with 3 men from Project 2,3 /

with Project 2.3 samples from Boat Mission No. 4,

on DDE 49 with courier,

9.
10,

in charge),

‘in’ charge)
Recovered records.

in charge).

Re-

in charge)»

Packaged and shipped samples

ICM 7 ~ Used as ahip passenger pickup for personnsl from ESTES and BATROKO
via DDE hhg to Elmar,
ICM 4k) - Used as aircraft passenger pickup for personnel from ESTES and BATROKO
returned to Elmer via PHY,

-2
Je

crn

yee

suena

Select target paragraph3