Today's missiong accomplished plug reactivation of Station 1550 and 1342 plus some Program
18 recovery on Nan,

Cable laying for Station 90 postponed, but a reconnaissance of the area was conducted.

Following shipped on USS NICHOLAS DDE 4h9 to be placed on Flyaway 4s:

Ganma Film for

Project 2,1, Plutonium Detectors for Project 2,3 and Fallout Samples for Project 2.58 and 2.5de
USNS AINSWORTH arrivals organized into system with UCRL basing personnel on AINSWORTH with
on USs ESTES,
rose.
Decontamination of Tare continues with power and Marine Ramp scheduledf
for tomorrow,

In accordance with message received from CIG 7.3 all LCU's and LCM's (both Navy and H&N)

and all barges ready for operation at 0700, in accordance with standards set by oroty
Project 1,4 recovered both of tneir instrumented buoy cana,

J-) representatives (:
and
arrived with primary job of keeping watch on
trailers and packing plan for recovered items being retgrned to Elmer,

Decision reference to placing Station 90

has been reached,

CDR
_ coneurs in Operations Letter
INTERNE errive off Station 90 Monday afternoon,

as amended.

It is now planned to have

,

arrived at Bikini Atoll and made a survey of the Atoll and entire recovery situation,

The following BRAVO Copter Missions were completed (B/h) according to the following

priority;

1,

Servis ..... Rad-Safe Survey.

2.

(In Charge and Monitor),
_ (H&S) and 1 photographer ..... Project 13.4
and Project 13.5. Go to Station 1341 at Able. Completed damage assessment surve.

3.

k Be Wmen -

h,

(In Charge),

:

_ ~ plus TU-7 monitor

eeere Go to Charlie, Able and reef areas, Campletea survey of submarine cable,
markerg and DUK? entrances to Station 1341 and 1200,

Project 2,.5b -

.

(In Charge),

(Monitor) ..... Spent

15 minutes at Nan, Love, How and George and 5 minutes at Fox. and Tare Compound

and recovered fallout samples,