c.
PRIVACY ACT MATERIAL REMOVED

u:

-

Teesray Saeki |
ne

- 16 March 195,

DAILY DIARY = BIKINI ATOLL
J=3/157

F

:

H&N cable crew located the break in the firing cable to Station 90 at 0950

hours, and completed repair operations at 1300 hours. Nan - Love cable will be
augnented tomorrow by checking the second Nan - Love cable,

After completion of repair in the firing cable a timing run was made at 1500

hours and was successful,

George film was found to be deterforating, bat replacement

film was delivered this afternoon,

General activities were slow; boating continued to be rough; approximately

thirty (30) copter missions flow.
H&N preparing for next LST.

The following changes in J=3 personnel occurred todays

LR
2.

*

arrived aboard the USS ESTES today.
departed for Parry to be on hand for Army Ordnance

Inspection Team.

LST 551 departed for Parry at 1330 (J-4 Message gives TG 7el load).
UCRL completing final instrumentation checks on Tare installations for KOON.
Decision tonight again announces tomorrow as ROMEO Minus Two.

yp 5 1 - J-3 Bikint

‘

2 - Aamodt

jigs

|

L&5 - J-3 Elmer

|

ex,

Wh. TAs Soe

a

=

:

withinatinnmsnaters=onneromeapematslale

_Eaetneeeeerenemetaa”go Bay
TINS DOCUMENT CONSISTS OF__/_PAGEG)
X0__/_OF_-SCOPIES, SERIES

Ege
an
— aeme
——
=
ee
ee
SS ee aoe eel
a7 aes

Select target paragraph3