PRIMACAY GTMATERA,REMOVED
et Ve

Tuesdicv = 2 Febr

Eie23 J-I/7o
=

295 passengers were airlifted by the copter service on 1 Feb.

The new helicopter schedule, effective 4 Feb, has been distributed.

added.

Some helicopters were running ahead of schedule.

This has been corrected,

An LCM was set up to shuttle from Fox to the CURTISS on call.
to Projects l.2a, 1.3 and 1.7.

Arrangenents were made by

This will be of assistance

{J-4,) for the delivery of the RAYDIST Van to the

CURTISS at How.

- consulted

Noon flights were

of EG&G on recovery plans.

visited Nan and discussed RATT CKT operations with
of EG&G.
: present his views at the meeting scheduled at Elmer for 3 Feb.

quested

He re-

reviewed the remainder of Motorola installations with Cochrane of BG&G.
visited Fox and met with

quirezerts.

—

and firmed up final r&dio re= -

He also made arrangements to install a VexC-18 aboard the CURTISS for the use

of Sandia Corp.

:

Station 30 barge was unmoored at 1035 and tow was started to Bikini Island.

arrived at 1215 and started into LSD.

keel blocks at 1335.

Barge

Barge crossed the sill of LSD at 1250 and landed on

The LSD got underway at 1620 for Eniwetok,

difficulty encountered.

There apparently was no

of Froject 3.2 arrived with two of his men. He was anxious to get his work
started.
arrenged for his LCU 1348 to beach at 1000 on 3 February so that J-4 could
load the trailer into the LCU. J-6 lined up the storage area and office tent desired by returned to Parry as a result of a TrX sent by
Yas made a
jeep available at How by calling BG&G Net Station 18. Passengers will be meet at the
South Copter Landing Strip.
A memo was issued to all concerned establishing an "on call" M-boat service between
the Marine Cperations Office on George to the mock barge. Individuals can make their own
arrancenents with the Marine Office. Copter service to the copter barge was discontinued
at noon, 2 Feb.
:

.

visited

on Fox,

A special copter daily flight was set up for |
between Fox and Able for the renainder of this week.

discussed evacuation events with ©

(2G&G) and )
’

~ (Program 2).

tee
STHI BUTION:

OBany
1 - J-3 Tare

Mg’So2 - J-3 Elmer

it

Ga_@ner

|

pea RIENT CONSISTS OF_! PAGES)
bs DOCL

SERIES A
Ko__}or_2~ COFIES,St
—

_

ee

—.

vr

r

and & members of his project
;

(Program 15),

Select target paragraph3