€ PRIVACY ACT MATERIAL REMO€ED

_
ilerted J-3 as to possible support requirements if his source
arrives at Bikini about 18 February.

y

ir

7

discussed recovery.

Most of the basic information for planning

purposes has been obtained in the Pikini Area.
lYeparts Thursday for flying
tire and will spend Friday at Parry for discussions with TU-13. He will remain at

Parry to join

for the

alerted .
dry runs and recovery.

Friday.

~

conference on Saturday 6 February.

as to the Saturday 6 February meeting at Parry on evacuation,
All conferees were alerted and will arrive at Parry during

The copter dispatch net is being installed.

February.

Use is expected either 4 or 5
oe

The most confusing problem of the day was the breakdown of teletype and Arny
communications during the morning. This resulted in many messages being received

later at least three times in different wording. In addition it resulted in an
1110 priority message regarding the
shiprent by a special plane at 1830

never reaching...

message (referring to

At 1300 J~6 followed “through to J-6 Parry with another?
~ concerning what was to be done with the ~

containers once they arrived. Since the original
received, both J-3's were operating under a handicap.

message has never been

.

J- JTF SEVEN, visited J-3 and J-l, to discuss trailer locations

and evacuation problems.

1535.

He toured the Atoll via L-13 and returned to Farry at

discussed evacuation of 2.5a MB's and the cradles 1.4 and 1.6 buoy
boats will require a follow up as they are used up to KOON.

DISTRIBUTION:
py 1 ~ J-3 Tare
2&3 ~ J-3 Elmer

Select target paragraph3