Weather Reporting Element Supply Officer, who then made sure that the
other locations were given a full supply.

Majuro was purposely shorted,

sinco it-was known that a usable landing stfip existed thore.
tte Pele me

The Commander, Weathor Reporting Element, requested a team of
Supply Inspectors to inspect and close out weather island UPREALS.

The request was forwarded to Task Group 7044h
Personnel wore roquested to preparo ocean manifests on cquipmont and
supplics being shipped from the weather islands to the ZI.

This request

was forwarded to Task Group 7.487

The Roll-Up Plan for tho woathcor islends was completed on 13 March,
approved by this headquarters, and forwarded to TG 7.447

a

On 13 March a lettor was received from the Weathor Reporting Element
requesting a monitor to survey the property remaining at Rongerik to 7
ostablish the degree of radioactive contamination,
forwarded to 1 7.4,

This request was

The forwarding indorsement also requested infor-

mition concerning procedures for processing claims for clothing and
personal effects which became radioactive when personnel were evacuated,
This information was received from TG 7.4 and forwarded to Weather
Reporting Flenent“4

MAINTENANCE
Aircraft maintenance activity of the Weather Reconnaissanco Element
worked.around the clock during the month of March,

Eleven engine changes

were made, along with routine maintenance and inspections, which permitted

41. WREP Ltr Subj "Insp of UPREALS", dtd 9 Mar 54 (TAB #35)
42, WREP Ltr Subj "Pers 2o Prep Ocean Manifest", dtd 9 Mar 54 (TAB #36)
43.

3rd and 4th Inds to B/L, TAB #77 of TSUP History for February 1954

44.

WREP Ltr Subj "Condemnation of Radioactive Material", dtd 13 Mar 54

(TAB #37)
(TAB #38)