7a . 22 on 31 Marche® Tho Roll-Up Plan for this wit was prepared in draft form and coordinatedwith all elements. This plan will be issued early in April, well ahead of the 10 April doadlino established by TG 7.4. BILLETING Problems concerning billeting continued. An example was the hurry- up preparation required to house the personnel evacuated from Rongerik. Since all billeting spaces allotted to the Test Services Unit was being fully utilized, it was necessary to have Holmes and Narver (Civilian Contractors) build up tent floors and superstructure for mre tentse However, since these personnel were placed in the hospital for obser= ~ vation, this space was not required immediately. ee,a ~ WORK ORDERS Task Group 7.4 was requested to approve a number of work orders for the various elements of this unit. Those forwarded included a request to have the patio of the MATS Terminal resealed. This request Was promptly taken care of, however, there are still some leaks which will require a second treatment. Another request was to have the front of the Terminal, on the loading ramp side, painted with silver paint to improve the appearance, This request was disapproved as the cost would have been prohibitive. UTILITIES © During this month the failure of the main power cable created a shortage of water and electrical powor for a few days. Drastic conser- vation measures were required during this period?” 36. Hq TSUP Ltr Subj "Roll-Up Planning", dtd 31 Mar 54 (TAB #30) es 37. Hq TG 7.2 Ltr Subj "Consv of Water and Electricity", dtd 16 Mar 54 (TAB #31) - ‘ wm 4 Lhe