ame
mo

.

18

APPROACH CONTROL SOP
An Approach Control Standard Operating Procedure for this base was

sontto the elements of Test Services Unit possessing aircraft, on
13 March.
COMMUNICATIONS SECURITY
On 15 March, all elements were notified that certificates, stating
that communications security will be observed, was to be signed by all
personnel working with commmications,

These certificates were received

by this headquarters and forwarded to the Commmications Security Officer,
Headquarters, TG 7.4, in accordance with the provisions of TG 7.4

”

4

if

yr

AACS CIRCUITRY OUTAGES

‘

Regulation 100-2.

A visit to the Commmnications Element on 16 March was made to
determine the cause of reported lengthy AACS circuitry outages.

The

findings were submitted in a memorandum to the Commander, Test Services

Unit, on 17 Marche?
LOAD MESSAGES ON AIRCRAFT DEPARTING ENIWETOK FOR HICKAM
A survey was made on 24 March, of the composition, accuracy, handling

and disposition of aircraft load messages by the 1500-3 Air Base Wing
Detachment, PACD, and the handling and transmission of these messages by .
the Commnications Center at Eniwetok.

The result of the survey is

containedin a memorandum for the Commander, Test Services unit2?

29.

30.
AFWAJHD

Hq TSUP Memo to Comdr Subj "AACS Circuitry Outages and Allied

Problems", dtd 17 Mar 54 (TAB #24)
Hq TSUP Memo to Comdr Subj "Load Msgs on Acft Departing Eniwetok

for Hickam", dtd 24 Mar 54 (TAB #25)

Select target paragraph3