an
9
“ewe

0 stimilate interest in the drive, charts were designed to reflect
the percant of participation and the total amount collected from the
elements. “These charts were posted in the housing area,
GROUND SAFETY PROGRAM
During a routine inspection of the area by Captain Bogusz, a ground

safety hazard was discovered in the vicinity of Building #131.

This

hazard was reported in a letter to TG 7.4 requesting corrective action,
Task Group 7.4 replied that a work order was submitted to Holmes & Narver

for repair of this hazards ~~~ = 2

ere

ene

The monthly Unit Ground Safety Council meeting was held 29 March
1954.

Ground Safety Regulations were brought to the attention of all —

Ground Safety Supervisors,

A discussion was held regarding existing
=r «
ground safety hazards and recommendations were made to alleviate these
conditions.

POSTAL SERVICES
A recent postal inspection revealed that the Postal Officer, TG 7.2,
had no record of all units using AFO 187,

Furthor, that units using APO

187 had not appointed certifying officers for custom tags and gift
certificates.

Action was taken by Headquarters, Test Services Unit,

to publish Special Orders listing officers of the unit autherized to
sign custom tags and gift certificates?

Also, @ letter was sent to TG

7.4 Ifsting all the clemonts, plus units attached to Test Services Unit
for administration, utilizing “the address of APO 187.
7.

8.

‘me

Hq TSUP Ltr Subj "Mimutes of Grd Safcty Mecting", dtd 5 Apr 54 (TAB #6)

Hq TSUP SO #19, par 2, dtd 29 Mar 54 (TAB #7)

=

“fe

YS.

Select target paragraph3