be

25104, AN/TDR 27 C, and Thyac:

No problems arcse in the pre-

neration cf. these Geiccer-Nucllcr instruments,

Stockage of fifteen -f

each cf these instrucnts was sufficicnt to support all requircnents,

Supply
UALFguipnonts

Major itens, except for instruments supplied by LASL,

were reccived fren two scurees; the 4926th Tech Supply an‘ Task Group 7.4.
Originally it was plannea te plece the totel requirenents for beth UAL and
expendable items cn the Task Group so thet they would be in place at the

Ferwerd frea upon the section's arrival there,

However, secre cf the major

items wore immediately available at Kirtlanm’, so approximately 10% of our
UAL requirercnts were requisitioned through norieal sir Force channcls.

On

1 September 1953 the remaining requirements were placed on Task Grcup 7.4.
ilthough these requirements woro not ccmplctely filled in time for tha ~
first shot, cnough of them were supplicd te support the rissicn.

By ES ~“

all requirements had been filled.
There were no problems with the LASL oquipnment except that the instru.
ents wore unavailable until such a late date.

All instruncnts crrivel a3

proereaned,

Spore Parts ond Expentables:

Three scuress contihuted te the stook-

ace of spare parts anid oxpendebles, 4926th Test Sgualrea, Task Grcup 7.4,
and L.SL,

The Squadron supplicd connectors, a fow resistors, eapacitors,

battcrics, packing matcrials, paint, 2n?t tape.

A159 iton ronuircoent ues

placed cn Task Group cn 15 October for tubes, rosistors, eaprwitrs, batse.

~

trios, mcters, ani other rmisccllanccus equipment.
parts for all their instruments.

LiASL supplic! sper

In sone esses these 3yplicatc the ro-

quircucnts placed on Task Group en} the Squadren,

AFWONG

Yor