PRIVACY ACT MATERIAL REMOVED in use here. qe All GCA operators participated in the faniliarization program of the Section, visiting and observing procedures in the Control Tower and Approach Control facilities. ators, Three control tower oper- received several weeks of cross-training in operation ‘of the 4N/CPN-d. a 4,. Bevigational Aids - Fnivetok. . a The VHF/DF unit, an AN/URD-2, was satisfactorily flight-checked on5 March and was Notened as- operational. with the following, renark: "Unreliable below2000 ft beyond 50 niles in all quadrants." A totalof 462 steers was furnished to aircraft during the month. 422: control tower operators have been instructed in the use of the équipment. However, only three have been officially flight-checked. _- The AN/CPN-6 and the low frequency Homing Beacon were both ~ ~ operational as of 3] March. wus? 12 ; *)(0

Select target paragraph3