All GCA operators participated in the faniliarization program
of the Section, visiting and observing procedures in the Control
Tower and Approach Control facilities.
ators,
Three control tower oper-
received several weeks of cross-training in
operation ‘of the 4N/CPN-d.
a
4,. Bevigational Aids - Fnivetok.
.
a
The VHF/DF unit, an AN/URD-2,
was satisfactorily flight-checked on5 March and was Notened as- operational. with the following, renark:
"Unreliable below2000 ft beyond
50 niles in all quadrants." A totalof 462 steers was furnished to
aircraft during the month.
422: control tower operators have been
instructed in the use of the équipment.
However, only three have
been officially flight-checked.
_-
The AN/CPN-6 and the low frequency Homing Beacon were both
~ ~
operational as of 3] March.