atingunit to insure that this requirement is fulfilled.
e»
The Camander, Test Aircraft Unit, will provide the Test
Services Unit with a fully qualified Radiological Safety Monitor who
will accompany, and become a member of each re-entry team, until such
time as the radiation level on RONGERIK does not constitute a hazard to
personnel. The Commander, Test Aircraft Unit, has knowledge of this requirement and will be contacted directly in further coordination to be
effected by the Camender, Test Services Unit.
f,
As prt of his specific duties, the Rad/Safety monitor will:
(1)
(2)
(3)
Insure that no member of the re-entry team is unduly
exposed to excessive radiation.
Brief the team prior to take-off concerning the radia-
tion hazards which they are likely to encounter.
Determine the radiation hazard at each location on
RONGERIK scheduled for re-entry during a mission, this
function to be completed before an individual enters
the particular location,
(4)
7
Coordinate the issue of film badges, dosimeters, otees.nr ~
to all members of the re-entry party, supervise the
use and handling of the equipment and insure its proper
post-mission disposition.
g. On each re-entry mission, radiation intensities, as indicated by detection instruments, will be recorded and forwarded to the
Director of Operations, this headquerters, ATTN: Technical Projects
Division, upon return of the team to ENIWETOK, In addition, samples of
coral and other contaminated debris, found in the vicinity of working
areas at RONGERIK, will be obtained under the direct supervision of the
Rad/Safety monitor, who will convey the samples to a representative of
Task Group 7.1 upon return of the team to ENIWETOK.
The Rad/Safety member
of the team also will record on 2 map or sketch the approximate physical
location on the island at which cach sample was collected. To assist in
recording this important data, there are attached hereto, as Inclosure #1
forty (40) copies of a hand-drawn map of RONGERI(not drawn to scale).
Details concerning the foregoing red/safety requirements first should be
obtained from Lt Colonel James E, Crosby, Directorate of Operations, this
headquarters.
h. The Canmander, Test Aircraft Unit, has been requested to
provide the Test Services Unit with the following items of equipment to
support at least six (6) pers:nnel who willconstitute the re-cntry tean:
(1)
Fatigue type suits
(2)
Heavy socks
a
6
@5 |