- +A
2 ATEEN meena
soe
ee AIR, wetene
ne i ee mr
Gk
aia
3
~
CA
:
~/
x
Last primary sampling mission aircraft
Nar 54 Ses 1335
cH yee
RDay ss
:
a
FLYAWAY 1 and 2 depart)FRED for ZI with
rn
Sot
i
lands at ENIWBTOK (FLOYD2).
7400
4
oe.
samples aboard,
~1435
en
.
:
Bottle gas samples trobsported from FRED
'
nos
to ELMER via L-13 (or possibly H-19).
H-19 will be required if a bag sample is
rr
..
finvolved.
3450
_
ye,
:
2
7
ENIWETOK open ta nornei traffic,
CIC advised of tracks for third WB-29 (W-4)
phone,
* “10730
.
.
oe
.
ee,
(0755
‘
ow
}
PBM or C-47 from NAN to FRED, if operational
conditions permit,
CIC advised of tracks for ‘fourth WB-29 (W-5)
cloud tracking mission.
Inforwetion passed
- to AOG thru CiC or from ELMER by telephone,
1000
CTG 7.4 and Senior Controller return to
EV IWETOK, ,
'
—
24 Moar 54
=
Teleméter shot film records transported via
7
*
:
functions will be performed,
- 0840
‘
—
Post~mission rest day, Only essential
.
a
-
cloud tracking mission. Information passed
to aQC through CIC or from ELLER by tele- - <
.
.
‘
(2 cu. ft.) transported from FRED to ELMER,
Pe 2225.
Se,
wes
r,
}
One monitor plus 100 dbs of liquid samples
YES 700 |
Cob
‘
"
‘
.
Transport gas samples plus courier and
bageage from ELMER »,, H-19. These samples
Gestined for ZI via FLYAUAY 3.
0730
Dacontemination of aircraft begins.
0800
Commander’s Operational Briefing.
et
Units assess any demage to eircraft as o
result of ROMEO mission,
;
L-
1000
:
.
_—
CITY ‘SEVEN confirms K-Day, H-Hour and issues
execute order for KOON,
n,
'
CJTF SEVEN tranemits mossage relative to
closing|ofENIWETOK
airfield,
MageeRega
er
aot ae
Prepare arid °ReeRenae Participante
and Senior Official Observer team progran,
Director of Hateriel reports to CTG 7.4 on
damage to TG °7.4 aircratt and on the in-
a
.
-
.
a
-
1500
-
oc miesion oatlock for ‘29 larch.
.
Oe
Gxitaque of RONEO mission in building #79
(to be aan until completed)
329