ee!
end approximte schedule:
ARRIVE
w
LOCATION
“K plus 12
K plus 17
K plus 20
~K plus 23
K plus 27
REMARKS
RONGERIK
ENTWETOK
K plus 16
PONAPE
KUSAIE
MAJURO
K plus 21
K plus 24
Off-load RONGERIK personnel
K plus 18
and equipment consigned for
Enivetok,
K plus 28
Off-load KUSLIE and PON.PFE
personnel,
Off-lonad Navy property con-
PEARL HARBOR K plus 45
K plus 38
signed to PEARL HARBOR.
Possibly off-load a1] weather island equip for reship-
ment to SMAMA in case LST
NSC, OAKLAND, G.ALIF
K plus 55
(2)
. does not return to 21.
Off=-load all weather island
equipment.
Transportation of personnel from the forward area to permanent
duty station will be commenced as follows:
DET
NO,
PERM
DY STA
WREP=1
WREP~2
WREP-3
WREP~4
WREP-5
*#WREP-6
*#WREP-7
*4WREP-8
*#WREP-9
###WREP-10
*WREP-1]
~
Sedalin iFB 1
Edwerds AFB O
Great Falls 1
Vernalis AFBO
Tinker AFB
O
Tinker AFB
1
Tinker AFB
O
Tinker AFB
O
Tinker AFB
O
Tinker AFB
1
Tinkor AFB
1
1
2
3
2
7
23
21
21
21
2
0
2
2
4
2
q
24
21
21
21
3
1
FWD ARES
DY STA
DT TRANS
DESIRED
Fniwotok
Fniwetok
Eniwetok
Enivetok
Eniwetok
Rongerik
Ponape
Kusale
Majuro
Eniwetok
Enivetok
K
K
K
K
K
K
K
K
K
K
K
plus
plus
plus
plus
plus
plus
plus
plus
plus
plus
plus
MODE OF
TRAVEL
8
MTS
8
MTS
8
M.LTS
8
MATS
10 MATS
19 MATS
30 !.TS
30 MTS
30 MATS
30 MATS
35
MTS
FWD AREet
DEP POINT
Eniwetoe ~*~
Eniwetok
Eniwetok
Eniwetok
Iniwetok
Eniwetol:
Kvojalein
Kwajalein
Kwajalein
Kwajalein
Kwajalein
WCEP-1
WCEP-2
Tinker AFB
Hickam AFB
0
2
WCEP~3.. Hickam AFB
1
WCEP~4 Tokyo, Japan 2
WCEP-5
WEP~6
WCEP-7
c.
Tinker AFB
Hickam AFB
Hickam AFB
1
2
2
NM WANE AEe
Will remain at Hickam AFB until equipment departs Pearl Harbor,
2000 lbs TAT Equipment.
500 lbs TAT Equipment,
oonrnooor
*
*#
##%
NO.
PERSONNEL
off! fmn"Total
Eniwetok
Eniwetok
Eniwetok
Eniwetok
Iniwetok
Enivetok
Iniwotok
K
K
K
K
K
K
K
plus
plus
plus
plus
plus
plus
plus
1
1
4
6
10
12
15
MATS
MATS
MATS
MATS
MiTS
MATS
MATS
Iniwetok
Eriwotok
Eniwetok
Fniwetot.
Eniwetok
Irive tek
Eniwe bob.
Supply Action:
(1)
UPREALS will be inspected by an insrector from Task Growp 7.4
prior to supplies being loaded aboard the LST.
(2)
—_—
~ ae
Incomplete or inadequate supply action pertaining to de*ach, mentsupplies willresult in-delaying the LST. movement as
supply action will be complete and as prescribed prior to
“ty
shipment,
(3) Each detachment cormander will turn-in his completed UPREAL
(AF Form 115), control register and supporting docuncnts to
Commander WREP prior to departuro from the weather island,
TAD NO,
_70
259
me4K,