one 2
-<
L tle Hokiingdeg. the National Archives
Pacific SouthwestRegion
RRA? ERBimy
~
¥e
Doth weere
iw
. OEP por
IL... 22s. GATED JULY, 15,
1994
3/13/57
so
. “Ro. 98,
Page 2 ,
FROM ANTON SINISGALLI TO
. DIANE S. NIXON:
Kev.
,
;
Move the latrine from the barracks building to the say room and provide . _
a shed for laundry facilities,
These instructions supersede the design requirements for weather stations in .a
.
paragraph 3 of JTF~7 letter. The Rad-Safe Station is oti to be:antler to)\
the Wotho Station,
3e
-
X.
Review the generator capacity. at the° existing stations to ascertain if at is a
sufficient to carry the additional load of the ice making machine and electric
grill requested in paragraph 7 of JTF~7 letter,
required make Provisions in your estimate,
If larger generators are
“Therefore, you are. requested to.prepare an estimated construction schedule which _
will show the number of days required after notification of availability of funda",
Teletype reference(0) is quoted as follows:
"HOHNER TO SANDERS INFO LY COL WATER A GRAY, REF MY LTR ETEsPWH-313 DATED FEB 2p
os
| 1957 IN REGARD TO WEATHER AND RAD-SAFE STATIONS, DUE TO MCI SINTERPRETATION OF
.
“REQUESTED COMPLETION DATE DISREGARD FIRST SEVTHNCEOF NEXT TO LAST PARA AND ALLOF
LAST PARA OF LTR, PROVISIONS WILL BE MADE FOR FUNDING OF CONST IN FY 1958 BUDGET
NOW UNDERPREPARATION, REF ETE: FUH=345"
Authorised for Engineering
and Design:
Fred W, Hohner
AEC Contract Representative
S. P. Howell
Project Manager
R. fy Alvy
- Engineering Manager
co: Joe B, Sanders, AEC
AEC Contract Representative
Branch Ghief, ERO
Project Manager-9/,2
Operations Division (2)
Chief Design Mngineer
Ass't Controller-942
P. L, Atkine
Chief Estimator (2)
H&N Resident Manager, 0/S (2)
H&N Resident Ingineer, 0/S (3)
H&N Resident Controller, 0/S
R. R, Alvy
F, D. Bates
'E RK Berrien
B. J. Cherney
B. R. Coupland
¢
C. W. Bubree
GE Daverin ~
Vv. M. Farel
T. W. Galvin (2)
R, R. Gunny (2)
H. C. Hale
M, Roberts
EK L. Milew
Central Files
QFFICTAL USE OEY
E.0. 98, Rev. 3
oa