Repraduced from the holdings. of che National Archives’ Ge S; : HOIMES & NARVER, INC. Rngineera ~ Constructors “ORCLASSIFTED PER DOE’. LETLER DATED GULY, 15, — _ FROM ANTON SINISGALLI™ TO DIANE S. NIXON Contract No, AT~(29-2)~20 . ERAt ERBimy 3/13/57 To: | Project Engineering File From: Chief Project, Engineer : AQ&QUS «BO, 98, Reve 30 Typed: March 3, 1957 gobr - Ret 942 New Rad-Safe Station at NATIONAL AKCHIV: REPOSITORY -LACEIC SoUTHM, RESIDENT MANAGER, EPG; Chief Estimator COLLECTION RG 326 ATO ENER af | ACTION BOX No, 54870 (rey) Abe Identification No, 19630 Reference (A) Confidential letters J-4/000.93 d&0ee"s11= MEATHER ANA RADSA lo ". 8} C) H&N Account No, ~ — 1-30-57 and 1-98-57 may be seen in Project_Engineer Fitek Copies of same will be tranamitted to Jobsite, Letter ETE:FWH 343 dated 2-26-57 (H&N 36228). Teletype Hohner to Sanders dated 2-27-57, 95005/95105 Description of Work BEST COPY AVAILABLE The issue of this Engineering Order authorizes the above action addressees to prepare: 74 @ plan set, cost estimate and construction schedule for a new Rad-Safe Station ab Rongelap. This station is to be similar to the one located on Wotho, all in accordands with reference confidential letter (A) dated February 11, 1957, and as modified by --5 reference letter (B), corrected with reference Teletype (C). Plans and cost estimates will be forwarded to Home Office Estimating Department for further processing, , Reference letter (B) is quoted asfollows: "You are hereby authorized to deaign and prepare estimates for Weather and Rad-Safe.er Stations as requested in JIF~7 letter dated February 11, 1957. - "Estimates should be prepared for each single location for both the new stations and the rehabilitation of existing stations as funding for this project has not been definitely determined.. "During recent meetings in Washington various suggestions in regard to design were . offered as follows: 1. Tanks for potable water are to be fabricated of non~corrosive material. 2._ The plan for the four new weather stations is to be based on the Tarawa plant,. | “with minor exceptions, namely: . a. Move antennas so that not more than 150! of drop-lead to the Operations Building No. § is necessary. The antenna can be directly over the building if required, QO FFECIAL OHLI EO, 98, Rev. 3

Select target paragraph3