couorstle Ve
.erif{ns Cole
T=
*~
hy an emsunt cleteted by the tine recafred to tring tle ecvanced
type of resctor up to tha presently exleting cevelope.sntel ststus
of the T=1,
Construction of thave 1 ChT preand tert fcilitice at the
“ne pling cnd epectfientions
for both tie J.T fecility snd builcines within the sé-intetration
ead Service frea (witch ere slrcady uncer contract) will be reviewed
with the intent of offecting whstever econalez my be possible
unter ti:da new AN? Procrane
Tie construction of the facility in
which to test on the croun4 at full pover prototype aircraft mcloar
propulsion systecs vill ke postponed,
por A®
CHIVERncerely yours’,
SIGNED AND
DISPATCHED
Goréson dean
Chrircan
}e
*™
unier contract, vill te celayed,
)
4
vote .
@
a le
ot Zi
vs ew
ete Meh at led |veska sla.
ad
“
€
a
oe
,
LiTS will ocntinuey hovever, the IsT fzeility, wioleh is not yet
SECPETARIAT ~
.