couorstle Ve

.erif{ns Cole

T=
*~

hy an emsunt cleteted by the tine recafred to tring tle ecvanced

type of resctor up to tha presently exleting cevelope.sntel ststus

of the T=1,

Construction of thave 1 ChT preand tert fcilitice at the

“ne pling cnd epectfientions

for both tie J.T fecility snd builcines within the sé-intetration
ead Service frea (witch ere slrcady uncer contract) will be reviewed

with the intent of offecting whstever econalez my be possible

unter ti:da new AN? Procrane

Tie construction of the facility in

which to test on the croun4 at full pover prototype aircraft mcloar
propulsion systecs vill ke postponed,

por A®

CHIVERncerely yours’,

SIGNED AND
DISPATCHED
Goréson dean
Chrircan

}e

*™

unier contract, vill te celayed,

)

4

vote .
@
a le

ot Zi
vs ew

ete Meh at led |veska sla.

ad

“
€
a

oe

,

LiTS will ocntinuey hovever, the IsT fzeility, wioleh is not yet

SECPETARIAT ~

.

Select target paragraph3