Table 2.

Land area fixation and/or decontamination efficiencies.*

Method

Mean initial

(dpm/m*)

Mean final

(dpm/m?)

Efficiency

(percent)

Plowing

2630

55

97.9

Oiling and scraping

1240

55

95.6

205

15

92.7

1405

118

91.6

Disking

500

54

89.2

1.0-inch water leaching

515

65

87.4

79

il

86.0

121

37

69.4

8133

3660

55.0

380

309

18.7

0.3-inch water leaching and scraping
0.3-inch water FeCl>

Scraping
Oiling (RC-0O road oil)
0.3-inch water leaching
0.3-inch water-Alconox leaching

*From Dick and Baker (1967)

71

Select target paragraph3