JOHNSTON ATOLL
Fa&s NO.

81012
USER

ADC

PROGRAM 437

TITLE

ADC Facilities Building
STRUCTURE /FACILITY NO.

SCIENTIFIC STATION NO.

100 and 118

BoD

91-77-21 and 9Ji-1¢-d¢2
FOO

FUNDING
AGENCY

SSD

($000)

ENGR

PROC

IJTF-8
CRO 5-66
CRO2-65

TOTAL

FURN

PRE-GO
Prior Cost 35.1

ADC

CONST

PRE -GO
Prior Cost 21.1

PRE -GO
Prior Cost

TOTAL

191.7

226, 8*

147. 2%

168.3

2.6

35.3

37.9

58.8

374.2

433.0

COMPLETED

DESCRIPTION Building 100 was constructed prior to 1963 and was designed and
originally used as a warehouse. The building was later modified to accommodate
a BTL Guidance System with associated activities and offices serving the Thor
Missile System. Building 100 and the adjacent radar antenna tower were modi-

fied in 1967 to accommodate a change to the Titan I Guidance System. The build-

ing is 80 x 320 x 15-ft. from floor to roof joists with concrete block walls, tar
paper roof and a concrete floor. A concrete block fire wall divides the building
at midpoint. One passageway with fire door is provided through the fire wall.

The west 184-ft. of the 320-ft. long building is finished off and includes the Tita

I Guidance Facilities, Direction Center, Test and Evaluation Center, Communi
cations Center, and a number of offices.
The floor of the Radar and Computer

Area (2,348 square foot} is false (raised) flooring.
building is air conditioned.

The entire west end of the

The east 136-ft. end of the building is a warehouse area and is not finished off
or air conditioned except for a 39 x 82-ft. enclosed dehumidified storage area
in the northeast corner. The dehumidified storage area is served by a separate
air conditioning system with equipment housed ina 7 x 1l-ft. lean-to structure
located outside the north wall of the building. Outside the south wall of Build-

ing 100, opposite the Radar and Computer Area, is a 22 x 32-ft. lean-to equipment room housing MG sets, controllers and part of the air conditioning equip
ment.
This lean-to structurehas concrete block walls, rolled roofing paper
roof and concrete floor.