Gea.

JOHNSTON ATOLL
F &S NO.

TITLE

USER

STRUCTURE ‘FACILITY NO.

81002

ADC

PROGRAM 437

Surveillance and Inspection (S&I) Building
BOD

SCIENTIFIC STATION NO.

787

None
FOD

FUNDING
AGENCY

SSD

PROC

ENGR

($000)

CONST

TOTAL

PRE-GO
Prior Cost

20.9

184.4

205, 3%

TOTAL*

20.9

184.4

205.3

FURN

4

COMPLETED
DESCRIPTION This building (completed in 1964) is a 40 x 55-ft. steel frame
structure with corrugated cement asbestos roof and siding, and concrete floor.
The building consists of high bay area, anda storage and parts area. The high
bay area is 31 x 40 x 22-ft. high and contains a 5~ton movable bridge crane with
a 15-ft. hook height. The bridge crane is mounted on rails and moves in an
easterly and westerly direction. A trolley permits northerly and southerly poSitioning of the hook. An overhead 12 x 12-it. electrically operated metal door
provides access into the high bay. The storage and parts area is 24 x 40 x 12 1/2ft. high and is provided with a 10 x 10-ft. metal door.
The entire building is fully insulated and air conditioned. Air conditioning units
located outside of the building provide a total of 6500 cfm of air. Electrical
power of 120/208, 60 cycle, 3 phase is supplied from a panel located inside of
the building.

DRAWINGS:

91-787-Al and A2
91-787-Cl
91-787-S1 thru $3

91-787-M] and M3
91-787-E2 thru E4
91-787A-~M1l and M2
91-787-W1l, W2 and W6

*Cost for air conditioning is included under F&S No. 81012.
* Includes cost for office bunker F&S No.

VOLI

81-2

81003.

Select target paragraph3