se...

JOHNSTON ATOLL
FasNO.

TITLE

USER

STRUCTURE, FACILITY NO.

SCIENTIFIC STATION NO,

JTF

None

None

04006

FUNDING
AGENCY

JTF-8
RDT&E
CRO 9-64
AEC

COMMUNICATIONS

Signal Cable Plant

($000)

ENGR

PROC

PRE-GO
Prior Cost 10.5
POST-GO
Estimate 5/65
| SUBTOTAL
10.5
' PRE-GO
Prior Cost
9.3
POST-GO
Estimate 5/65

SUBTOTAL
TOTAL

FOD GO+60

CONST

TOTAL

484. 3

494. 8

60.0
544, 3

60.0
554.8

436.1

445.4

54.2

9.3
19.8

Bob

FURN

54.2

490. 3
1034.6

499.6
1054.4

PRIOR YEARS
ENGINEERING
Drawings:

Completed.
91-079-W4 thru W33

91-079-W40 and W41
91-079-W100 and W101

PROCUREMENT
Johnston Atoll.

Completed.

Signal Cable trough and lids are stored on

CONSTRUCTION A signal cable trough system was installed to serve all Users
on Johnston Island. Signal and diagnostic cables of all scientific Users will be
placed in troughs, Installed cables must carry overall shielding. Troughs
are covered with either parkway or traffic lids depending upon the kind and
weight of traffic that will cross over the troughs.

POST -GO
CONSTRUCTION The portion of the trough system which remains to be completed is in the northwest and southwest parts of the island, and a 600-ft.
section along the south edge of the taxiway, opposite Building 697.

4-3

VOL I
+8

Select target paragraph3