JOHNSTON ATOLL
FasNO.
TITLE
USER
STRUCTURE, FACILITY NO.
SCIENTIFIC STATION NO,
JTF
None
None
04006
FUNDING
AGENCY
JTF-8
RDT&E
CRO 9-64
AEC
COMMUNICATIONS
Signal Cable Plant
($000)
ENGR
PROC
PRE-GO
Prior Cost 10.5
POST-GO
Estimate 5/65
| SUBTOTAL
10.5
' PRE-GO
Prior Cost
9.3
POST-GO
Estimate 5/65
SUBTOTAL
TOTAL
FOD GO+60
CONST
TOTAL
484. 3
494. 8
60.0
544, 3
60.0
554.8
436.1
445.4
54.2
9.3
19.8
Bob
FURN
54.2
490. 3
1034.6
499.6
1054.4
PRIOR YEARS
ENGINEERING
Drawings:
Completed.
91-079-W4 thru W33
91-079-W40 and W41
91-079-W100 and W101
PROCUREMENT
Johnston Atoll.
Completed.
Signal Cable trough and lids are stored on
CONSTRUCTION A signal cable trough system was installed to serve all Users
on Johnston Island. Signal and diagnostic cables of all scientific Users will be
placed in troughs, Installed cables must carry overall shielding. Troughs
are covered with either parkway or traffic lids depending upon the kind and
weight of traffic that will cross over the troughs.
POST -GO
CONSTRUCTION The portion of the trough system which remains to be completed is in the northwest and southwest parts of the island, and a 600-ft.
section along the south edge of the taxiway, opposite Building 697.
4-3
VOL I
+8