TOUNSTON ATOLL i

fF &S$ NO.

0306X

USER

SCIENTIFIC STATION NO.

TG 8.6

BoD

None
*

FUNDING
AGENCY
AEC

($000)

FOO

ENGR

MILCON

TOTAL

22.9

231.6

254.5

7.1

7.1

9.6

152.0

161.6

9.6

159.1

168.7

32.5

390.7

PRE-GO

Prior Cost

CRO 4-66
CRO 68-13
CRO 68-144

CONST

PRE-GO

Prior Cost

JTF -8

PROC

FY 69
SUBTOTAL
TOTAL

.

423.2

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

91-510-Cl
91-510-Al thru A3
91-510-S1
91-510-M1 thru M3

91-510-E1 and E2
JS 91-510-MI101
JS 91-510-E100 and E101

PROCUREMENT Completed.

4

CONSTRUCTION The laundry (completed in 1964) is a 40 x 100~-ft. steel frame
building with metal siding|ands10 x 25-ft. lean-to. The boilers are in a separate 25 x 40-ft. building.Im general, the laundry consists of marking and receiving, washing and extracting, drying, pressing, wrapping and office areas.

The laundry is equi pred
shift basis.

and copper

erve 1800 persons per six-day week on a nine-hour

pipes have been removed and replaced with plastic

FY 69
ENGINEERING Completed.
Drawings:

:
.
*

91-510-C2

91-510-M6thru M8 and M10

91-510-A4 and A5
91-510-S2 and $3

JS 91-510-M103 thru M106
JS 91-5106-E102 thru £105

PROCUREMENT In progress.

3-30

VOLI

4