TOUNSTON ATOLL i
fF &S$ NO.
0306X
USER
SCIENTIFIC STATION NO.
TG 8.6
BoD
None
*
FUNDING
AGENCY
AEC
($000)
FOO
ENGR
MILCON
TOTAL
22.9
231.6
254.5
7.1
7.1
9.6
152.0
161.6
9.6
159.1
168.7
32.5
390.7
PRE-GO
Prior Cost
CRO 4-66
CRO 68-13
CRO 68-144
CONST
PRE-GO
Prior Cost
JTF -8
PROC
FY 69
SUBTOTAL
TOTAL
.
423.2
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
91-510-Cl
91-510-Al thru A3
91-510-S1
91-510-M1 thru M3
91-510-E1 and E2
JS 91-510-MI101
JS 91-510-E100 and E101
PROCUREMENT Completed.
4
CONSTRUCTION The laundry (completed in 1964) is a 40 x 100~-ft. steel frame
building with metal siding|ands10 x 25-ft. lean-to. The boilers are in a separate 25 x 40-ft. building.Im general, the laundry consists of marking and receiving, washing and extracting, drying, pressing, wrapping and office areas.
The laundry is equi pred
shift basis.
and copper
erve 1800 persons per six-day week on a nine-hour
pipes have been removed and replaced with plastic
FY 69
ENGINEERING Completed.
Drawings:
:
.
*
91-510-C2
91-510-M6thru M8 and M10
91-510-A4 and A5
91-510-S2 and $3
JS 91-510-M103 thru M106
JS 91-5106-E102 thru £105
PROCUREMENT In progress.
3-30
VOLI
4