JOHNSTON ATOLL
F &S NO.

0304C
USER

TITLE

Inter-Island Power Distribution System
STRUCTURE FACILITY NO.

JTF

SCIENTIFIC STATION NO.

None

gop

None
FOD

FUNDING
AGENCY

AEC

($000)

ENGR

PROC

CONST

TOTAL

PRE-GO
Prior Cost

29.2

660.9

690. 1*

TOTAL

29.2

660.9

690. 1s

FURN

COMPLETED
DESCRIPTION

The inter-island power distribution system (completed in 1968)

distributes power at 4160 volts from Johnston Island to Akau,

Hikina and Sand

Islands. This system utilizes 500 MCM, 5 kv submarine cable to form a closed
loop tie-in from the power plant at Johnston Island to each of the above islands.
Two feeders are provided from the Johnston Island power plant. Feeder Number 9 is routed through Sand Island to Hikina Island. Feeder Number 10 is
routed to Akau Island. Feeder Number 9/10 inter-connects Hikina and Akau
to complete the loop. The loop tie-in arrangement described above provides
100 percent power backup at Hikina and Akau Islands. One of the 300 kw generators previously located on Johnston Island has been installed on Hikina Island
which provides additional power backup.

DRAWINGS:

91-084-Cl1 thru C4
91-084-S1

91-084-E1 thru E5
JS 91-084-C100 thru C103

“Does not include cost for Sand Island Power Distribution (see F&S No.

3-19

0304G).