\ aoe,

JOHNSTON ATOLL
F&SNO. |
TITLE

0304A

SUPPORT

Power and Telephone Distribution System

USER

STRUCTURE. FACILITY NO.

SCIENTIFIC STATION NO,

JTF

None

None

Boo

FOD

FUNDING

($000)

AGENCY

AEC

ENGR

PROC

CONST

TOTAL

236.5

5083.3

5319.8

236.5

5083.3

*5319.8

FURN

PRE-GO
Prior Cost

TOTAL

COMPLETED

DESCRIPTION Electrical and telephone service has been modified to provide
service to all portions of the island as follows:
a.
b.
c.

Electrical power distribution is at 4160 volts, AC, 3 phase.

A modified loop radial distribution system has been provided.
Electrical and telephone cables have been installed in a common underground duct bank using conventional manhole and duct configuration.

Refer to F&S Number 0304H for description of Island substations.
DRAWINGS:

91-080-S1 thru S6

91-080-E1 thru E41

91-080-SE1 and SE2
JS 91-080-E105 thru E108

91-080-E5) thru E53

*Costs shown include construction of Power Plant (Building 48) and Fuel Tank

(Building 49) see F&S No. 0304E.

VOL I

April 1969