cP 7e JOHNSTON ATOLL SUPPORT 02006A 6. A hoist and trolley system was installed in Room 117 on the first floor of the JOC. Drawing: 7. Page 4 91-20-M39 A key system telephone main frame was installed on the third floor of the JOC. Drawing: JS 91-20-S115 POST -GO ENGINEERING Design of electrical wiring, power panel schedules and circuit breaker assignments will be accomplished. The locations of electrical and telephone outlets will be as indicated on Drawing 91-SK-01 sheets | through 4. PROCUREMENT Available jobsite electrical materials will be utilized as much as possible and will be supplemented as required. CONSTRUCTION Partitions and electrical and telephone outlets will be installed as indicated on Drawing 91-SK-01 sheets | through 4. Computer installation and checkout will be accomplished in the Subtask A909 Computer Area, Room 102. 2-11 CG, VOLI femmes