JOHNSTON ATOLL

SUPPORT

02006A
6.

A hoist and trolley system was installed in Room 117 on the first floor
of the JOC.

Drawing:
7.

Page 4

91-20-M39

A key system telephone main frame was installed on the third floor
of the JOC.

Drawing:

JS 91-20-S115
POST -GO

ENGINEERING Design of electrical wiring, power panel schedules and circuit
breaker assignments will be accomplished. The locations of electrical and
telephone outlets will be as indicated on Drawing 91-SK-01 sheets | through 4.
PROCUREMENT Available jobsite electrical materials will be utilized as
much as possible and will be supplemented as required.
CONSTRUCTION Partitions and electrical and telephone outlets will be installed as indicated on Drawing 91-SK-01 sheets | through 4. Computer

installation and checkout will be accomplished in the Subtask A909 Computer
Area, Room 102.