COP,| JOHNSTON ATOLL
02006A

SUPPORT
Page 3

MODIFICATION F -~ No-Break Power Unit
A second 100 kw no-break power unit was installed in the generator room on the
first floor of the JOC.

This unit, which can be operated independently or in

parallel with the other unit, provides 100 kw of 120/208 volt, 60 cycle, 3 phase
power to the Subtask A909 Computer Area.
Drawings:

91-20-M34

JS 91-20-E104

91-20-E31

MODIFICATION G@ - Laboratory Room
A 10 x lé-ft. shielded enclosure was installed in the first floor TC laboratory
area. This enclosure will provide an RF free environment for payload checkou
This facility was formerly listed under F&S No. 01107.
Drawing:

91-030-W8

MODIFICATION H

l.

A pressure regulating damper was installed in the duct running to the
telephone room on the second floor.

Drawing:
2.

- Minor Modifications

91-20-M10

Room numbers were stencilled on doors.

Acoustical tile was installed

in various locations and a door and wall were removed.

Duplex strainers

were installed in the Salt waterlines.

Drawings:
3,

Plotting boards were provided for the TG 8.3 Operations Control
Center, Room 318, onthe third floor of the JOC.

Drawings:
4,

None

Air conditioning was installed in the Radar Penthouse.

Drawings:
5.

Miscellaneous

JS 91-20-M102

JS 91-20-E118

A WWYV antenna was installed on the roof of the JOC.

A support pole fo.

the installation of a user furnished VLF antenna was provided. Ten pairs
of shielded audio cable was provided from the Transmitter Shack, Build g

23, to the T&F center, Room 430, on the fourth floor of the JOC.
Drawing:
VOLI

91-20-W9
2-10

Select target paragraph3