JOHNSTON ATOLL
F &S NO.

01089
USER

‘

Trailer Pad

-

Subtask A630

STRUCTURE/FACILITY NO.

TC

:

SCIENTIFIC STATION NO.

None

FUNDING
AGENCY

PMR

SCIENTIFIC

TITLE

($000)

sop

None
ENGR

FODGO+150

PROC

CONST

TOTAL

.9

2.1

7.0

10.0

-9

zZ2.]1

7.0

10.0

FURN

POST -GO
Estimate 8/68
TOTAL

POST -GO

ENGINEERING

To be accomplished.

PROCUREMENT

To be accomplished.

CONSTRUCTION Space on Akau Island will be provided for parking two PMR
furnished 8 x 35-ft. trailers. The trailers will be placed on concrete pads

centered around coordinates N 209, 950; E 204,320.

The long axis of the trailers

will be oriented in a north-south direction with the power outlets on the east side
of the trailers. Each trailer will require approximately .10 kw of 120/208 volt,
60 cycle, 3 phase power. An isolation transformer located within the trailer will
provide instrumentation power. PMR will furnish the power cable required between the trailers and the power source, Substation No. 5-3.

*,

1-79