JOHNSTON ATOLL
F &S NO.
01089
USER
‘
Trailer Pad
-
Subtask A630
STRUCTURE/FACILITY NO.
TC
:
SCIENTIFIC STATION NO.
None
FUNDING
AGENCY
PMR
SCIENTIFIC
TITLE
($000)
sop
None
ENGR
FODGO+150
PROC
CONST
TOTAL
.9
2.1
7.0
10.0
-9
zZ2.]1
7.0
10.0
FURN
POST -GO
Estimate 8/68
TOTAL
POST -GO
ENGINEERING
To be accomplished.
PROCUREMENT
To be accomplished.
CONSTRUCTION Space on Akau Island will be provided for parking two PMR
furnished 8 x 35-ft. trailers. The trailers will be placed on concrete pads
centered around coordinates N 209, 950; E 204,320.
The long axis of the trailers
will be oriented in a north-south direction with the power outlets on the east side
of the trailers. Each trailer will require approximately .10 kw of 120/208 volt,
60 cycle, 3 phase power. An isolation transformer located within the trailer will
provide instrumentation power. PMR will furnish the power cable required between the trailers and the power source, Substation No. 5-3.
*,
1-79
id ' ’
VOLI