JOHNSTON ATOLL
TITLE
F &SNO.
Field Maintenance Shop
01056
USER

STRUCTURE /FACILITY NO.

Subtask A942
BOD

SCIENTIFIC STATION NO.

None
ENGR

($000)

FUNDING
AGENCY

JTF -8

-

280

TC

MILCON
CRO 7-64

SCIENTIFIC

PRE-GO

Prior Cost

PROC

CONST

TOTAL

FURN

6.9
6.9
Construction costs are included in F&S No. 01004

POST-GO
Estimate 2/65
6.9

TOTAL

FOD GO+60

1.7

1.7

4.0

1.7

8.6

4.0

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

91-280-A] thru A3
91-280-E1 and E2

PROCUREMENT

91-280-S1
91-276-Cl

91-280-M1
91-276-E4

Completed

CONSTRUCTION This facility (completed in 1965) is a 40-ft. square prefabricated steel frame building with a clear inside height of 13-ft. The sides and
roof of the building are covered with corrugated asbestos cement and the building is erected ona5-~in. thick concrete floor slab. A 20 x 40-ft. area in the
north half of the building has been insulated and has a 12-ft. ceiling height.
This enclosure is the Guidance Area and storeroom andis air conditioned to
provide a temperature of 70° + 5°. The other half of the building is used as
office and shop area and has latrine facilities. A 12x 13-ft. high sliding door
is located at each end of the office and shop area.
Interior lighting provides 50 foot-candles at bench level. Two (2) foot-candles
of exterior lighting is provided on all four sides of the building.
Receptacles have been installed to provide 3 kw,
two Post-GO trailers.

120 volt, 60 cycle power for

Two 400 cycle converters have been furnished by AMICOM for Post-GO installa -

tion at this facility.

One converter will provide 400 cycle power to the two battery

trailers. The second converter will provide 400 cycle power to duplex outlets
located in the Guidance area.
A 13-ft. high coral berm has been constructed on the south and east sides of
the building (see F&S No. 02066).